ECDC
Operations
EFFICIENT CAPACITY. DECARBONIZED COMPUTE.

Find capacity with
a lighter footprint.

Compare datacenter capacity, price, efficiency, energy sourcing, and water signals in one place—then send one structured request to acquire it.

8 INDICATIVE OPTIONS

Availability, pricing, and environmental attributes require vendor confirmation.

Publicly indicated
Digital RealtyNorthern Virginia Campus

Northern Virginia

4.8MWindicative capacity
ReadyQ4 2026
Efficiency≤1.30 target
Price$$
Renewable optionsWater-aware
AWSAzure
Illustrative signal · reviewed 8 days ago
ECDC estimated
CyrusOneDFW Metro Campus

Dallas

3.2MWindicative capacity
ReadyQ1 2027
EfficiencyEfficiency modeled
Price$
Grid + optionsLow-water design
Carrier neutralCloud on-ramps
Illustrative signal · reviewed 12 days ago
Vendor confirmed
Iron MountainPhoenix Data Campus

Phoenix

2.4MWindicative capacity
ReadyQ4 2026
Efficiency≤1.28 target
Price$$
Renewable matchedWater-aware
AWSGoogle Cloud
Illustrative signal · reviewed 2 days ago
Publicly indicated
CoreSiteLA Connected Campus

Los Angeles

1.2MWindicative capacity
ReadyQ3 2026
EfficiencyEfficiency indicated
Price$$$
Renewable optionsReview required
450+ networksCloud exchanges
Illustrative signal · reviewed 5 days ago
Publicly indicated
EquinixLondon Metro

London

1.8MWindicative capacity
ReadyQ1 2027
Efficiency≤1.25 target
Price$$$
Renewable matchedWater-aware
Fabric900+ networks
Illustrative signal · reviewed 6 days ago
ECDC estimated
QTSAtlanta Metro Campus

Atlanta

5.5MWindicative capacity
ReadyQ2 2027
EfficiencyEfficiency modeled
Price$
Renewable optionsClosed-loop ready
Carrier neutralDark fiber
Illustrative signal · reviewed 14 days ago
Vendor confirmed
Digital RealtyFrankfurt Campus

Frankfurt

2.1MWindicative capacity
ReadyQ4 2026
Efficiency≤1.24 target
Price$$
Renewable matchedWater-aware
ServiceFabricDE-CIX
Illustrative signal · reviewed 3 days ago
ECDC estimated
EquinixSingapore Metro

Singapore

0.8MWindicative capacity
ReadyQ2 2027
EfficiencyEfficiency modeled
Price$$$
Grid + optionsReview required
FabricCloud on-ramps
Illustrative signal · reviewed 17 days ago
AN ECDC SERVICETerraCompute

Purpose-fit compute for AI training and inference.

TerraCompute matches workload requirements with GPU availability, deployment timing, energy profile, cooling readiness, and geography—so teams can compare more than hourly price.

01Workload fit

Training, inference, fine-tuning, or reserved clusters—mapped to the right accelerator and topology.

02Energy-aware placement

Compare grid profile, renewable options, utilization, and the timing flexibility of your workload.

03Infrastructure readiness

Screen density, cooling, network, storage, and deployment window before commercial outreach.

THE SIMPLE PATH

From signal to signed capacity.

01Search the market

Explore normalized public, partner, and analyst-reviewed capacity signals.

02Compare the whole footprint

Review freshness, density, price, energy sourcing, cooling, and water-related signals together.

03Request once

Send requirements to ECDC. We validate availability and coordinate the qualified next step.

MEASURE WHAT MATTERS

Capacity decisions need
environmental context.

Energy profileRenewable procurement options, grid context, and carbon-aware workload timing.

Efficiency and coolingPUE targets, rack density, liquid-cooling readiness, and utilization signals.

Water awarenessCooling design and water-risk context, always qualified before a recommendation.